News Feed

Oct 25, 2017

Preston Waste Water Treatment Works dual contract award with MMB & United Utilities

Category: General

Franklyn Yates Engineering Limited have formed a ‘strategic alliance’ with their clients MMB to deliver the design, mechanical and electrical scope of work on a target cost basis for the Inlet Works and Flushing Reservoir pipework at Preston Waste Water Treatment Works. This is a radical new way of contracting between Tier 1 and Tier 2 companies which breaks with the traditional form of engagement.


Franklyn Yates Engineering are managing the full M&E package along with their delivery partners FBW Engineering and Interface Contracts who will oversee the technical design and electrical works.